Quant Quiz

1.       40
men build a wall 4 meters high in 15 days. The number of men required to build
a similar wall 5 meters high in 6 days would be

(1)115                                           (2) 105                 
(3)135                                           (4)125                  
(5) None of These

2.       If
24 men can do a piece  of  work in 27 
days  working  7 
hours  per  day, 
in how  many  days 
can  14 men do it working at the
rate of 9 hours per day?
(1) 30                                             (2) 8                      
(3) 32                                             (4) 36                    
(5) None of These
3.       A  200 
m  long  2 
m  high  and 
40  cm  wide 
wall  is  built 
by  20  men, 
30  women  and 
60  children working 6 hours a day
in 20 days. How long a wall 1. 5 m high 60 cm wide can  be built by 10 men, 15 women, 30 children
working 9 hours a day in 15 days?
(1)75 m                                         (2)150
m             
(3)225 m                                      (4)166.
66 m      
(5)None of These
4.       A  150m 
by  20m trench of depth 1.  5m is 
dug by  16 men  in 10 days. A trench twice  the 
length  & one-third the depth
but thrice the width can be dug by half the men in how many days?
(1)40                                              (2) 30                    
(3)20                                              (4)10
(5)None of These
5.       7
women and 6 men can do what 4  men and 11
women can do in the same  time.  19 women can do the same job in how much
time?
(1) same                                      (2)
half                 
(3)one-third                               (4) two-third     
(5) None of These
6.       If
A can walk a certain distance in 40 days when he takes rest 9 hours each
day;  how much long will he take to walk
the same distance twice as fast and rest twice as long each day?
(1) 50 days                                  (2)
45 days         
(3) 38 days                                  (4)16
days          
(5)None of These
7.       If
20 men or 25  women or 30 boys can
do  a piece of work in 16 days by working
10 hours a day, then  how many men  with 10 
women and  18  boys can do 3 1/4 times the  same work in 
26  days by working 8 hours daily?
(1)35 men                                   (2)30
men          
(3) 40 men                                  (4)48
men          
(5) None of These
8.       Some
persons can do a job in 12 days. Two times the number of those persons will do
half of that job in
(1) 6 days                                     (2)
4 days            
(3) 12 days                                  (4)3
days             
(5) None of These
9.       400  men working 
9  hrs a  day 
complete  ¼ th  of 
the  work  in 10 
days.  The number of  additional men, working 8 hrs a day, required
to done the remaining work in 20 days is
(1) 675                                          (2)275                  
(3) 250                                          (4)225                  
(5)None of These
10.   If
24 men working 8 hours a day can do half a piece of work in 9 days, in how many
days will 36 men working 12 hours a day finish one-third the same work?
(1) 2 days                                     (2)
2 2/3 days    
(3) 3 1/3 days                             (4)4
days             
(5) None of These


Answer

Qns.
Ans.
Qns.
Ans.
1
4
6
1
2
4
7
2
3
1
8
4
4
1
9
2
5
1
10
2