Quantitative Aptitude Quiz 21 July- Daily Quantitative Aptitude Quiz for SBI Clerk Mains 2020

Attempt Quantitative Aptitude Daily Quant Mock for SBI Clerk Mains. Get ready to score brilliantly in the upcoming SBI Clerk Examination. Adda 247 has brought SBI Clerk Mains Quantitative Aptitude Daily Mock to boost your preparation. This Mock contains 15 questions of Mixture & Allegation, Pipes & Cistern and Approximation.

The Quantitative Aptitude Section is one of the scoring sections of the bank examination. The  Quantitative Aptitude is definitely be helping you if practicing it with Sincerity. 21st July 2020 SBI Clerk Mains Quiz Based on- Mixture & Allegation, Pipes & Cistern and Approximation. Stay with Bankers Adda for the latest Quizzes, Study notes, Test series, and other helpful study material.

About Course:

"Did you Know? In this pack you will get All new content we launch in the next 1 months"
 

This is the most recommended and NRA-CET ready Pack!
 
Use Code 'DREAM' to avail at the best price today

This package Includes IBPS PO Study Material -  Subscribe Now

About Bank Mahapack
If you are preparing for more than 1 Banking & Insurance exams then this is the pack we recommend you buy.

It is most cost-effective and you get access to 100% digital content for Bank & Insurance exams on Adda247.

Banking & Insurance Exams Covered in this Pack

Additionally, you can crack any private bank job exam with content in this pack.

 

Bank & Insurance Mahapack Highlights 

  • Structured course content
  • Recorded classes available if you miss any live class
  • Previous Years’ Papers of all upcoming exams.
  • Full Length Mocks based on the latest pattern with detailed solutions (video solutions for certain topics)
  • Topic level knowledge tests
  • Strategy sessions, time management & Preparation tips from the experts

 

Validity: 1 Month

Bank Maha Pack
  1. Unlimited Live Classes & Recorded Video Courses
  2. Unlimited Tests and eBooks
  3. 1 Lakh+ Selections
Validity
  1. 15 Months
  2. 9 Months
  3. 3 Months
  4. 27 Months
  5. 1 Month
6799 453/month
BUY NOW

Q1. A manufacturer has 200 litres of Acid solution which has 15% acid content. How many litres of solution with 30% Acid content may be added so that Acid content in the resulting mixture will be more than 20% but less than 25%

(a) More than 100 litres but less than 300 litres

(b) More than 120 litres but less than 400 litres

(c) More than 100 litres but less than 400 litres

(d) More than 120 litres but less than 300 litres

(e) None of these

Q2. A jar was full of milk. A person used to draw out 20% of the milk from the jar and replaced it with sugar solution. He has repeated the same process 4 times and thus there was only 512 gm of milk left in the jar, the rest part of the jar was filled with the sugar solution. The initial amount of the milk in the jar was :

(a) 1.25 kg

(b) 1 kg

(c) 1.5 kg

(d) Cannot be determined

(e) None of these

Q3. Two pipes A and B can fill a tank in 15 hours and 20 hours respectively while a third pipe C can empty the full tank in 25 hours. All the three pipes are opened in the beginning. After 10 hours, C is closed, In  how much time, will the tank be full?

(a) 12 hrs

(b) 13 hrs

(c) 16 hrs

(d) 18 hrs

(e) 14 hrs.

Q4. A cistern can be filled by two taps A and B coming from the same main pipeline in 20 and 30 minutes respectively. Both the taps are opened at the same time but due to partial closing of a valve in the main pipeline tap A was supplying only 4/5th of its capacity and tap B, 5/6th of its capacity. After some time, the valve in the main pipeline was opened fully thereby enabling the two taps to supply at full capacity. It took another 5 minutes to fill the cistern completely. What was the time for which the main pipeline was get partially closed?

(a) 7 minutes

(b) 9 minutes

(c) 11 minutes

(d) 13 minutes

(e) 6 minutes

Q5. Two pipes A and B can fill a tank in 20 hours and 25 hours respectively and a third pipe C can empty the tank in 50 hours. All of three pipes opened together and after some times pipe C is closed. If total time to fill the tank from beginning is 13 hours, find after how much time pipe C was closed?

(a) 11 hrs

(b) 9 hrs

(c) 8.5 hrs

(d) 7.5 hrs

(e)10.5 hrs.

To attempt the complete quiz refer to the links given below:
21 July Click to Attempt Now on Web Click to Attempt Now on App Download PDF

Practice with Crash Course and Online Test Series for SBI Clerk mains:

Register here to get study materials and regular updates!!

If you are preparing for SBI Clerk Mains Exam, then you can also check out a video for Quantitative Aptitude below:

SBI Clerk 2020 | Quantitative Aptitude | Data Interpretation for SBI Clerk Mains Exam

Click Here to Register for Bank Exams 2020 Preparation Material

Visit Achieversadda.com and participate in discussions with other aspirants and achievers. Get answers to your queries and connect with others on Achieversadda.com

Check updates related to notification, vacancies, eligibility, exam pattern, syllabus and more related to upcoming bank and insurance exams 2020:

SBI PO 2020 IBPS PO 2020 SBI Clerk 2020 IBPS Clerk 2020
RBI Grade B 2020 RBI Assistant 2020 LIC AAO & AE SEBI Grade A 2020